Skip to content

FAQ: Boiler Upgrades in Scotland

Honest advice, certified installer partners

Frequently asked questions

Your boiler upgrade questions, answered

Specific to Scotland — no generic UK advice. If your question isn't here, call us on 0141 230 0198.

There is no boiler replacement support in Scotland — but interest-free credit is available for heat pumps, subject to status. Here are the answers to the questions we hear most often from Scottish homeowners.

How much does a new gas boiler cost in Scotland?

+

A modern A-rated condensing boiler installed typically costs £2,000–£4,500. The price depends on the boiler type (combi, system, or regular), your home size, and whether flue position or pipework needs changing. A survey gives you a fixed price for your property.

Is there a boiler upgrade support in Scotland?

+

No. Scotland does not have a boiler replacement support. England's Boiler Upgrade Scheme covers heat pumps, not gas boilers. Interest-free credit is available, subject to status.

What support is available in Scotland?

+

Interest-free credit is available for heat pumps, subject to status. We will check what applies to you.

Should I replace my boiler or switch to a heat pump?

+

It depends on your home\'s insulation, budget, and heating system. Heat pumps are more efficient long-term and benefit from support, but work best in well-insulated homes. A modern condensing boiler is a practical upgrade if your home isn\'t fully insulated yet. Our installer partners assess your home and recommend what genuinely works.

How long does a boiler replacement take?

+

A straightforward combi swap typically takes 1 day. A system change (switching types or repositioning) takes 1–2 days. A heat pump installation takes 2–4 days. Our installer partners protect your floors and clean up after the work.

Is solar worth it in Scotland?

+

Yes, for many homes. A 4kWp system in Glasgow generates 2,800–3,240 kWh per year (per MCS MIS 3002). With SEG export payments, the return on investment period is typically 8–12 years. A survey assesses your roof and gives exact figures.

What is the Smart Export Guarantee (SEG)?

+

The SEG pays you for excess electricity you export to the grid from solar panels. Rates vary by supplier and tariff — currently around 4–25p per kWh. Check current rates with your electricity supplier. We never guarantee specific SEG rates.

Do I need planning permission for solar panels or a heat pump?

+

Solar panels on a house are generally permitted development in Scotland, with conditions (not protruding more than 200mm from the roof, not on a listed building or in a conservation area without consent). Heat pumps are also generally permitted development with conditions. We advise on this during the survey.

What is the difference between G98 and G99?

+

G98 applies to solar systems under 3.68kW per phase — notified to your DNO within 28 days of installation. G99 applies to systems above 3.68kW — requiring prior DNO approval before installation. We handle all DNO paperwork for you.

Who is my DNO in Scotland?

+

SP Energy Networks covers central and southern Scotland (Glasgow, Edinburgh, Central Belt). SSEN covers northern Scotland, the Highlands and Islands. We confirm your DNO during the survey and handle all notifications.

What areas do you cover?

+

We connect homeowners across Scotland with certified installer partners — from Glasgow and Edinburgh to the Highlands and Islands. We match you with the right local installer for your area. See our area guides for region-specific information.

Still have questions?

Call us on 0141 230 0198 or get a quote — we're happy to help.

Last updated: 28 October 2026 | Reviewed by the Scottish Energy Efficiency team
Ask
the AI